You are here

New $9m incinerator for Sando hospital

Published: 
Saturday, February 8, 2014
CEO of the South West Regional Health Authority Anil Gosine examines the control panel of the new state-of-the-art incinerator at the San Fernando General Hospital during the ribbon cutting ceremony, yesterday. PHOTO: RISHI RAGOONATH

The South West Regional Health Authority (SWRHA) formally commissioned a new $9 million state-of-the art incinerator at the San Fernando General Hospital yesterday, several months after the old one collapsed. CEO of the SWRHA Anil Gosine welcomed it, saying the last one was 30 years old and had no longer met international environmental standards, including those of the World Health Organisation.

 

Gosine said the environmentally-friendly M1000 Medical Waste Incinerator was designed and built in France to meet European standards, which had higher parameters than those which obtained in T&T. “It is capable of destroying 250 kilogrammes of waste material per hour and will be put to use immediately,” Gosine said. 

 

“Aside from reducing the sheer amount of quantity of solid waste by roughly 90 per cent, the incinerator is also used to manage certain materials that cannot be disposed of properly. With a daily destruction capacity of 2.5 tonnes, the incinerator here at the SWHRA is the only one of its sort in public health in Trinidad.” Gosine also said the incinerator is the only system able to eliminate highly infective micro-organisms which other processes cannot destroy.

 

“This includes biohazard waste, including medically used trash contaminated with blood or other infectious materials like needles, syringes or similar objects,” he said. He noted that incineration of biohazard waste requires an operating temperature in excess of 1,000 degrees Celsius, for which the old incinerator was not designed. The SWRHA’s chairman, Dr Lackram Bodoe, said the unit was another example of the authority’s commitment to patients, staff and other stakeholders. 

 

He also said the new incinerator is fully automated, with a monitored air-scrubbing and emission system that exceeds European standards and has benefits over other types of waste-treatment systems. “We are also doing our part to minimise damage to the environment,” said Bodoe. He praised Water Tech, the company that handled the procurement and installation of the incinerator, for completing the project within the budget and the specified time frame. 

Disclaimer

User comments posted on this website are the sole views and opinions of the comment writer and are not representative of Guardian Media Limited or its staff. Guardian Media Limited accepts no liability and will not be held accountable for user comments.

Please help us keep out site clean from inappropriate comments by using the flag option.

Guardian Media Limited reserves the right to remove, to edit or to censor any comments. Any content which is considered unsuitable, unlawful or offensive, includes personal details, advertises or promotes products, services or websites or repeats previous comments will be removed.

Before posting, please refer to the Community Standards, Terms and conditions and Privacy Policy