bpTT says it has successfully completed the first phase of its “small pools” drilling campaign which began in October last year. The campaign includes three wells in the Mango field, one well in the Savonette field and three wells in the Angelin field.
According to the company, currently the wells are producing approximately 180 million standard cubic feet a day (mmscfd) with the third well still ramping up.
The “small pools” drilling program includes sidetracks of existing wells, in addition to access to new exploration segments that have not produced previously. It targets smaller accumulations of gas resources that are near to bpTT’s existing infrastructure and allows these resources to be accessed more efficiently and brought into production faster using existing infrastructure.
“The successful completion of the wells in our Mango field is great news for bpTT and for Trinidad and Tobago. It demonstrates our continued commitment to developing resources in our existing shallow water acreage in the Columbus Basin,” bpTT president David Campbell said.
He added: “Our goal is to find and recover as much of the gas resources as we can, small or large and particularly those that can be quickly brought into existing infrastructure. Each successful well helps to stem the declines in these more mature gas fields and contributes to our ability to meet our gas supply commitments to the NGC and Atlantic.”
