A day after South Oropouche residents staged protests over potholes left by the Water and Sewerage Authority, Public Utilities Minister Marvin Gonzales says he will hold managers to account when protocols fail.
WASA has come under public condemnation for digging up newly paved roads to fix leaks and not doing restoration work afterwards.
This happened at Harris Village South Oropouche opposite the cemetery, which has now become a single lane due to the potholes.
Speaking to Guardian Media, Minister Gonzales said he received a preliminary report about the potholed road,
"I was informed that because of a breakdown in communication at the district level, the area manager from WASA did not attend to the matter with the level of professionalism expected," he revealed.
He added:
"There is in place a robust system to address leaks and road restoration expeditiously,".
Minister Gonzales said, following the protest, he intended to take further action to ensure that restoration protocols are in place.
"I will request of the Board to hold managers to account when they neglect to follow approved protocols," he added.
On Wednesday during protests, the resident pretended to fish inside the pothole to show the size and depth. They used a bucket to bail out water from the pothole to show the volume of water which gathers inside the hole whenever it rains.
Councillor for Avocat /San Francique Doodnath Mayrhoo said there continues to be a waterleak opposite the Oropouche cemetery. He called on WASA to fix 15 potholes from Harris Village to Fyzabad which were all dug up and left unattended by WASA.
Mayrhoo also said 50 feet away from the pothole, the Solomon Hochoy Highway was paved. He questioned why the Works Ministry did not see it fit to pave the road.
Fyzabad MP Dr Lackram Bodoe produced several letters dated since 2021 in which he asked the Ministry to fix the road near the cemetery, long before it became one-way. He also called for the restoration of the roadway from Southern Main Road to Ralph Narine Trace. Dr Bodoe said the road to Fyzabad was "in a perilous state" and he said there could be loss of life if the potholes were not repaired soon.
On June 22, last year, Minister Sinanan spoke in Parliament and said a leaking water line on the opposite side of the road had resulted in saturation of the road and the embankment. He said the road was repaired by WASA and the scheduled road repair work in that area was carded for the end of June. However, that was never done.
Asked when the road will be fixed on Wednesday, Minister Sinanan said all roads under the Ministry will be fixed based on a formula and subject to the allocation of funding from the Ministry of Finance.
